TransPhotoTransportul electric urban

Roster

Ho Chi Minh City, Metro


Started construction in 2012 and is scheduled for completion in late 2023, with operations starting in 2024.


Service:  any  ·  passenger  ·  work / freight  ·  museum

Nothing found

Settings

Show all records in one table  ·  Show all withdrawn and transferred vehicles in a separate table  ·  Operational first
Abandoned up  ·  Abandoned down
Table without photos  ·  Show photos
Full history  ·  Short history
Include submodels  ·  Exact model
Show chassis model  ·  Hide chassis model

Show in the list:  Numărul de serie  ·  VIN  ·  Chassis #